ONSITE INSTALLATION IS REMARKABLY SIMPLE AND TAKES ONLY 2-3 DAYS.
Upon arrival, the completed unit is connected to:
> A water source
> A wastewater discharge
> A drinkable water discharge
> A power source
After installation, we conduct continual tests to ensure that the plants are operating successfully. Then the plant is commissioned, and we put the operation and maintenance program into place.
All Triton plants are equipped with a remote monitoring system, which lets Triton know when to perform preventative maintenance and ensures that operation is smooth and uninterrupted.